What our clients say
As a client-led business it’s important for us to seek feedback – good and bad – from our customers on a regular basis. Without this vital information we’d be unable to improve and stay at the cutting edge of modern construction.
Working with John Weaver was a pleasant experience, communication was effective and reduced construction time. Site and Office staff kept me in the loop. Site liaison with occupiers was very successful and reduced the amount of travel and supervision time required for the scheme which covered five sites over a wide geographical area. Well done John Weaver’s and thanks.
Pleasure to work with John Weaver Contractors on this scheme, the enthusiasm and previous site experience of the team (particularly Jamie Jarrett & Jennifer Parker) made our job much simpler during the construction stage of the works. Good to see JWC bringing through young enthusiastic staff and giving them the opportunity to develop their skills on site.
An excellently executed project from start to finish. Simon Williams (Site Manager) should be highly praised for his positive attitude and total commitment to the project as site manager. Equally Nathan Davies MCIOB (Senior Contracts Manager) should also be credited for his management of sub-contractors suppliers on a tight program, particularly with regard to the comfort cooling significant variation.An excellent working relationship was forged between the whole project team which undoubtedly contributed to the success of the project. It has been a pleasure!
As client project manager for both the Glynn Vivian Art Gallery and The Guildhall Swansea, I found working with JWC a real pleasure. In my experience, JWC work collaboratively with the client team, design specialists and the wider supply chain in a professional and proactive way so as to minimise potential cost, quality and time issues during construction. I have found that their approach to change none adversarial and as for problem solving of difficult buildability issues on site, this has been second to none especially on projects of an historical, listed buildings nature. I have also found the finished product to be of the very highest quality.
John Weaver Contractors delivered a very high standard of services, on this difficult and fast paced project. Phasing works around the needs of patients on an almost room by room basis, the site works team performed exceptionally well and maintained very good relations with patients and Ward staff at all times.
We would like to thank all at John Weaver (Contractors) Limited for the job well done. Your company has demonstrated due diligence and dedication on completing this project. Even though there were several problems during the construction phase, your company was able to maintain the productivity of the development. Your attention to specifics of the construction as well as the proper scheduling has been commendable, resulting in a flagship facility for Hyundai. We would specifically like to thank Iain Gray for all his conscientiousness during the construction phase. Thank you again for your efforts.
Throughout the project John Weaver (Contractors) Ltd always worked in a professional manner and the quality of workmanship has been excellent throughout. They proactively participated in the value engineering of the construction cost to meet the budgets of all three stakeholders and their approach was carried right through the construction phase until completion. Quoting NEC clause 10.1, I can say from experience that John Weaver (Contractors) Ltd really do act in a spirit of mutual trust and co-operation. I would have no hesitation in recommending John Weaver (Contractors) Ltd for future works.
There were never any problems, only solutions. They took a collaborative approach, with an open book style of working with all parties fully aware of what was going on. The quality of workmanship was of a very high level. Evidence of which can be seen one year on where there are very few defects for such a large facility. There was no project contingency and we understand that the building was delivered slightly under the target cost. This again pays compliment to the way the project was managed by the JWC team. The project was a great success all round and we certainly look forward to working with JWC on future projects.
Throughout the project John Weaver (Contractors) Ltd always worked in a professional manner and the quality of workmanship has been excellent throughout. In particular, their willingness to work with the college in access to the contract area, and manage works in accordance with element of the college's timetable was carried out willingly. I would have no hesitation in recommending John Weaver for future works.
During the delivery of the Conservation and Restoration of Llanelly House project we found John Weaver (Contractors) Ltd. to be very pro-active and collaborative in their approach to the preparation and agreement of the Final Account. The Final Account sum was established promptly within a few months of the project’s practical completion, which was due to John Weaver’s quantity surveyor keeping on top of the project at all times.
John Weaver Construction were very professional and proactive in carrying out the refurbishment in Chemistry. The building was occupied during the course of the contract. John Weaver Construction worked with us throughout and have delivered a very successful scheme.
I have known the staff on both a professional and personal level for an extended number of years. We have developed very good working relationships and I have always found the company to be entirely trustworthy and reliable. I would have no hesitation in making any recommendation to use John Weaver Contractors Ltd and would be happy to take a phone call to discuss this reference should this be required.
John Weavers are an extremely professional company to work with. They have a wide range of traditional building skills available and completed the Llanelly House restoration to a high standard of repair and fit out.